Coordinated from site to handover

Coordination stages from survey through handover.

Project delivery

DISCUSSION SCOPE

From equipment configuration to integration requirements.

01

Equipment configuration

Confirm models, capacity, and related specifications using the supplied files.

02

System connection points

Clarify interfaces, installation conditions, and the work requiring coordination.

03

Supporting technical files

Agree on the documents needed to review equipment, installation, and operation.

PROJECTS

The central hot water system on siteReference project

Hospitality

Central hot water for an accommodation building
EngineeringManufacturingSupplyInstallation
Water treatment for a healthcare buildingReference project

Healthcare

Water treatment for a healthcare building
DesignIntegrationSupplyCommissioning
Technical RO for a production facilityReference project

Industrial

Technical RO for a production facility
EngineeringSupplyCommissioning
Hot water equipment for a healthcare facilityReference project

Healthcare

Hot water equipment for a healthcare facility
FabricationSupplyInstallation coordination
Centara Mirage Resort Mui NeReference project

Hospitality

Centara Mirage Resort Mui Ne
Mui Ne
Vietnamese-German University (VGU)Reference project

Education

Vietnamese-German University (VGU)
Binh Duong

Discuss integration requirements.

Send the available files and the points you need to clarify.